Back to top
Image Alt

TB4 Ronam

  /  Videos   /  New Creaform head office: assembly of the structure in full winter conditions

New Creaform head office: assembly of the structure in full winter conditions

It is with great pleasure that our team has been mandated to build the new head office and operations center for Creaform. This project, located in Lévis, will meet LEED Silver standards. Discover in this first video the progress of the work, which began in the fall of 2016 and which, in February and March 2017, was in the stage of erecting the structure. See the assembly of the structure in time-lapse and during full winter conditions! With an area of 75,000 sq. ft. and spread over 2 floors, the structure will have a steel section and eventually a wood structure on the upper floor.